Bidder Name: M/S Nuruzzaman khan
| Years | Value of the Participant (BDT) | Exchange Rate | US$ Equivalent |
|---|---|---|---|
| 2024-2025 | BDT. 485,43,19,802 | - | - |
| 2023-2024 | BDT. 73,06,49,786.56 | - | - |
| 2022-2023 | BDT. 488,80,87,094.47 | - | - |
| 2021-2022 | BDT. 113,95,90,444.04 | - | - |
| 2020-2021 | BDT. 195,64,52,173.37 | - | - |
| Total Construction Turnover | BDT. 1356,90,99,300.44 | - | |
| Average Annual Construction Turnover | BDT. 271,38,19,860.088 | - |
| SL | Name of Tender | Name of Authority | Name of Work | Amount of Payment as in Payment Certificate | Value of the Participant | Role of Share | JV Share |
|---|---|---|---|---|---|---|---|
| 1 | M/S Nuruzzaman khan | Establishment of Netrokona University Project, Netrokona | Land Development Works at The Project area of Netrokona University, Netrokona Under The Project of "Establishment of Netrokona University, Netrokona" Project. | 4,02,38,795.00 | 4,02,38,795.00 | 100% | 100% |
| 2 | M/S Nuruzzaman khan | Establishment of Netrokona University Project, Netrokona | Construction of Retaining Wall (RCC Frame with Brick Wall) and 5 Nos. RCC Pipe Culvert of Netrokna University, Netrokna under the project of "Establishment of Netrokna University, Netrakona" during the year 2022-23 (Tender ID: 836869) | 1,20,49,135.00 | 1,20,49,135.00 | 100% | 100% |
| 3 | M/S Nuruzzaman khan | Executive Engineer, Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 26.500 to km 26.750 = 0.250 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 610559, DCP-BOR-RBP-04) | 4,75,32,007.00 | 4,75,32,007.00 | 100% | 100% |
| 4 | M/S Nuruzzaman khan | Executive Engineer, Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 44.450 to km 44.550 = 0.100 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 611025, DCP-BOR-RBP-06) | 1,03,13,278.00 | 1,03,13,278.00 | 100% | 100% |
| 5 | M/S Nuruzzaman khan | Executive Engineer, Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 44.550 to km 44.650 = 0.100 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 611026, DCP-BOR-RBP-07) | 1,30,39,267.00 | 1,30,39,267.00 | 100% | 100% |
| 6 | M/S Nuruzzaman khan | Bangladesh Diesel Plant Limited | Land Development works of Patuakhali 1320 MW Coal Fired Thermal Power Plant at Patuakhali (Phase-2) | 1,15,89,679.00 | 1,15,89,679.00 | 100% | 100% |
| 7 | M/S Nuruzzaman khan | Bangladesh Diesel Plant Limited | Embankment Construction and Earth Protection works of Patuakhali 1320 MW Coal Fired Thermal Power at Patuakhali. | 36,81,632.00 | 36,81,632.00 | 100% | 100% |
| 8 | M/S Nuruzzaman khan | Executive Engineer, Bagerhat O&M Division,BWDB, Bagerhat | River Bank Protective Work from km 0.000 to km 0.500 = 0.500 km at Khaulia near Sannashi Bazar Area along the Right Bank ofPanguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " Under Bagerhat O&M Division, BWDB, Bagerhat. (Package No. - K-01/2022-23). Tender ID-846278) | 15,25,04,695.00 | 15,25,04,695.00 | 100% | 100% |
| 9 | M/S Nuruzzaman khan | Executive Engineer, Bagerhat O&M Division,BWDB, Bagerhat | River Bank Protective Work from km 0.500 to km 1.000 = 0.500 km at Khaulia near Sannashi Launch Ghat Area along the RightBank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " Under Bagerhat O&M Division, BWDB, Bagerhat. (Package No. - K-02/2022-23) (Tender ID-828969) | 11,05,43,668.00 | 11,05,43,668.00 | 100% | 100% |
| 10 | M/S Nuruzzaman khan | Jolshiri Abashon Project, Bangladesh Army | Sand Filling at Project-2 of Jolshiri Abashon as per Location Map as attached annexure A (1st Contracts) | 244,02,33,864.00 | 244,02,33,864.00 | 100% | 100% |
| 11 | M/S Nuruzzaman khan | Jolshiri Abashon Project, Bangladesh Army | Sand Filling at Project-2 of Jolshiri Abashon as per Location Map as attached annexure A (2nd Contracts) | 175,54,80,017.00 | 175,54,80,017.00 | 100% | 100% |
| 12 | M/S Nuruzzaman khan | Jolshiri Abashon Project, Bangladesh Army | Dyke Work at Project-2 of Jolshiri Abashon as per Location Map as attached annexure A | 25,71,13,765.00 | 25,71,13,765.00 | 100% | 100% |
| Total for 2024-2025 | 485,43,19,802 | 485,43,19,802 | |||||
| SL | Name of Tender | Name of Authority | Name of Work | Amount of Payment as in Payment Certificate | Value of the Participant | Role of Share | JV Share |
|---|---|---|---|---|---|---|---|
| 1 | M/S Nuruzzaman khan | Establishment of Netrokona University Project, Netrokona | Land Development Works at The Project area of Netrokona University, Netrokona Under The Project of "Establishment of Netrokona University, Netrokona" Project. | 22,41,09,838.82 | 22,41,09,838.82 | 100% | 100% |
| 2 | M/S Nuruzzaman khan | Establishment of Netrokona University Project, Netrokona | Construction of Retaining Wall (RCC Frame with Brick Wall) and 5 Nos. RCC Pipe Culvert of Netrokna University, Netrokna under the project of "Establishment of Netrokna University, Netrakona" during the year 2022-23 (Tender ID: 836869) | 6,39,78,587.50 | 6,39,78,587.50 | 100% | 100% |
| 3 | M/S Nuruzzaman khan | Executive Engineer, DND (Project) BWDB, Narayangonj. | Drainage lmprovement of Dhaka-Narayanganj-Demra (DND) Project (Phase-2) | 15,39,81,044.00 | 15,39,81,044.00 | 100% | 100% |
| 4 | M/S Nuruzzaman khan | Executive Engineer - Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 26.500 to km 26.750 = 0.250 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 610559, DCP-BOR-RBP-04) | 4,75,32,007.00 | 4,75,32,007.00 | 100% | 100% |
| 5 | M/S Nuruzzaman khan | Executive Engineer - Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 44.450 to km 44.550 = 0.100 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 611025, DCP-BOR-RBP-06) | 1,03,13,278.00 | 1,03,13,278.00 | 100% | 100% |
| 6 | M/S Nuruzzaman khan | Executive Engineer, Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 44.550 to km 44.650 = 0.100 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 611026, DCP-BOR-RBP-07) | 1,30,39,267.00 | 1,30,39,267.00 | 100% | 100% |
| 7 | M/S Nuruzzaman khan | Executive Engineer, Bagerhat O&M Division,BWDB, Bagerhat | River Bank Protective Work from km 0.000 to km 0.500 = 0.500 km at Khaulia near Sannashi Bazar Area along the Right Bank ofPanguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " Under Bagerhat O&M Division, BWDB, Bagerhat. (Package No. - K-01/2022-23). Tender ID-846278) | 9,11,55,280.00 | 9,11,55,280.00 | 100% | 100% |
| 8 | M/S Nuruzzaman khan | Executive Engineer, Bagerhat O&M Division,BWDB, Bagerhat | River Bank Protective Work from km 0.500 to km 1.000 = 0.500 km at Khaulia near Sannashi Launch Ghat Area along the RightBank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation/Dredging of Bishkhali River in Bagerhat District " Under Bagerhat O&M Division, BWDB, Bagerhat. (Package No. - K-02/2022-23) (Tender ID-828969) | 11,34,94,589.00 | 11,34,94,589.00 | 100% | 100% |
| 9 | HCL-NZK JV | Rajdhani Unnayan Kartripakkha (RAJUK) | Land Development work at sector No 01 (Part), 03 (Part), 05(Part) & 07 (Part) of Purbachal New Town Project, (Package No. # 49, Group No # M) under Rajuk, Dhaka. During the year 2008-2009./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. | 2,66,24,276.00 | 1,30,45,895.24 | 49% | HCL-51% & NZK-49% |
| Total for 2023-2024 | 74,42,28,167.32 | 73,06,49,786.56 | |||||
| SL | Name of Tender | Name of Authority | Name of Work | Amount of Payment as in Payment Certificate | Value of the Participant | Role of Share | JV Share |
|---|---|---|---|---|---|---|---|
| 1 | M/S Nuruzzaman khan | Establishment of Netrokona University Project, Netrokona | Land Development Works at The Project area of Netrokona University, Netrokona Under The Project of "Establishment of Netrokona University, Netrokona" Project. | 63,49,04,228.13 | 63,49,04,228.13 | 100% | 100% |
| 2 | M/S Nuruzzaman khan | Executive Engineer, DND (Project) BWDB, Narayangonj. | Drainage lmprovement of Dhaka-Narayanganj-Demra (DND) Project (Phase-2) | 44,51,52,047.00 | 44,51,52,047.00 | 100% | 100% |
| 3 | M/S Nuruzzaman khan | Bangladesh Bridge Authority, Setu Bahabn, | Banani, Dhaka-1212. | Supply & Stockpile of Blasted Angular Rock for the Maintenance of River Training Works of Bangabandhu Bridge, Bhuapur, Tangail | 6,44,19,175.00 | 6,44,19,175.00 | 100% | 100% |
| 4 | M/S Nuruzzaman khan | Executive Engineer, Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 26.500 to km 26.750 = 0.250 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 610559, DCP-BOR-RBP-04) | 15,39,82,995.00 | 15,39,82,995.00 | 100% | 100% |
| 5 | M/S Nuruzzaman khan | Executive Engineer, Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 44.450 to km 44.550 = 0.100 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 611025, DCP-BOR-RBP-06) | 7,74,18,081.00 | 7,74,18,081.00 | 100% | 100% |
| 6 | M/S Nuruzzaman khan | Executive Engineer, Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 44.550 to km 44.650 = 0.100 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 611026, DCP-BOR-RBP-07) | 7,78,59,587.00 | 7,78,59,587.00 | 100% | 100% |
| 7 | M/S Nuruzzaman Khan | Bangladesh Water Development Board (BWDB) | Nawabganj O&M Division | | Bank Revetment work on the left bank of the Padma River at Charbagdanga from Km.11.567 to Km. 11.762= 195m with D/S End Termination in connection with Protection of Charbandanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of the Padma River under Nawabganj O&M Division BWDB Chapainawabganj during FY 2020-2021 & 2021-2022, Package No: CWP-17, Tender/Proposal ID: 488585 | 9,47,40,000.00 | 9,47,40,000.00 | 100% | 100% |
| 8 | NZK-DAWN JV | Bangladesh Water Development Board (BWDB), Naogaon | Division | | Dredging of Atrai River from km 20.000 to km 29.000 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB Naogaon During the FY-2020-21. (Package No Nao-W-13). (Tender/Proposal ID: 549469) | 7,32,54,782.00 | 1,83,13,695.50 | 25% | NZK -25% & DAWN-75% |
| 9 | M/S Nuruzzaman Khan By Power of Attorny | Bangladesh Army, 25 ECB, Sirajganj Economic Zone. | Protection of Proposed Economic Zone and Development of Reclaimed Land from Jamuna River in Sirajganj District. | 316,53,57,529.00 | 316,53,57,529.00 | 100% | 100% |
| 10 | M/S Nuruzzaman Khan (JV) | Bangladesh Diesel Plant Limited | Land Development works of Patuakhali 1320 MW Coal Fired Thermal Power Plant at Patuakhali (Phase-2) | 5,89,80,799.22 | 5,89,80,799.22 | 100% | 100% |
| 11 | M/S Nuruzzaman Khan (JV) | Bangladesh Diesel Plant Limited | Embankment Construction and Earth Protection works of Patuakhali 1320 MW Coal Fired Thermal Power at Patuakhali. | 6,62,74,062.00 | 6,62,74,062.00 | 100% | 100% |
| 12 | NZK-Millon (JV) | Bangladesh Water Development Board (BWDB) | Barisal O&M Division | | Bank Protection Work at the Left Bank of Sugandha River from km 1.300 to km 1.650 total 0.350 km to Protect Captain Mohiuddin Jahangir Dowarika Setu Bridge from Erosion of the Sugandha River at Babugonj Upazila in Barisal District under Barisal O&M Division BWDB Barisal during the year 2020-21 2021-22 & 2022-23. | 6,01,66,462.00 | 3,06,84,895.62 | 51% | NZK-51% & Millon-49% |
| Total for 2022-2023 | 497,25,09,747.35 | 488,80,87,094.47 | |||||
| SL | Name of Tender | Name of Authority | Name of Work | Amount of Payment as in Payment Certificate | Value of the Participant | Role of Share | JV Share |
|---|---|---|---|---|---|---|---|
| 1 | M/S Nuruzzaman khan | Establishment of Netrokona University Project, Netrokona | Land Development Works at The Project area of Netrokona University, Netrokona Under The Project of "Establishment of Netrokona University, Netrokona" Project. | 66,57,93,802.44 | 66,57,93,802.44 | 100% | 100% |
| 2 | M/S Nuruzzaman khan | UA, G (Army) Barisal, Sheikh Hasina Senanibash at Barisal. | CONSTRUCTION OF 1 X MAIN GATE WITH GUARD ROOM INCLUDING ANCILLARY WORKS FOR ESTABLISMENT OF SHEIKH HASINA CANTONMENT, BARISHAL: CA NO. EINC/104 OF 2017-2018 | 14,48,91,340.00 | 14,48,91,340.00 | 100% | 100% |
| 3 | M/S Nuruzzaman khan | Bangladesh Bridge Authority, Setu Bahabn, | Banani, Dhaka-1212. | Supply & Stockpile of Blasted Angular Rock for the Maintenance of River Training Works of Bangabandhu Bridge, Bhuapur, Tangail | 9,30,69,108.00 | 9,30,69,108.00 | 100% | 100% |
| 4 | M/S Nuruzzaman khan | Executive Engineer, Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 44.450 to km 44.550 = 0.100 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 611025, DCP-BOR-RBP-06) | 2,15,00,189.00 | 2,15,00,189.00 | 100% | 100% |
| 5 | M/S Nuruzzaman khan | Executive Engineer, Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 44.550 to km 44.650 = 0.100 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 611026, DCP-BOR-RBP-07) | 1,77,00,111.00 | 1,77,00,111.00 | 100% | 100% |
| 6 | M/S Nuruzzaman khan | Executive Engineer, Bhola O&M Division-1, BWDB, Bhola. | Bank Protection work from km 26.500 to km 26.750 = 0.250 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, Bhola. (Tender Id: 610559, DCP-BOR-RBP-04) | 2,53,99,992.00 | 2,53,99,992.00 | 100% | 100% |
| 7 | M/S Nuruzzaman Khan | Bangladesh Water Development Board (BWDB) | Nawabganj O&M Division | | Bank Revetment work on the left bank of the Padma River at Charbagdanga from Km.11.567 to Km. 11.762= 195m with D/S End Termination in connection with Protection of Charbandanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of the Padma River under Nawabganj O&M Division BWDB Chapainawabganj during FY 2020-2021 & 2021-2022, Package No: CWP-17, Tender/Proposal ID: 488585 | 6,08,04,934.00 | 6,08,04,934.00 | 100% | 100% |
| 8 | NZK-DAWN JV | Bangladesh Water Development Board (BWDB) | Joypurhat WD Division | | Re-Excavation of Little Jamuna River From Km. 0.200 to Km. 11.750 = 11.550 Km. in Connection With Re-Excavation of Tulshiganga, Little Jamuna, Chiri & Harabati River of Joypurhat District Project during the FY: 2020-2021. | 7,80,35,937.00 | 3,97,98,327.87 | 51% | NZK -51% & DAWN-49% |
| 9 | NZK-Millon (JV) | Bangladesh Water Development Board (BWDB) | Barisal O&M Division | | Bank Protection Work at the Left Bank of Sugandha River from km 1.300 to km 1.650 total 0.350 km to Protect Captain Mohiuddin Jahangir Dowarika Setu Bridge from Erosion of the Sugandha River at Babugonj Upazila in Barisal District under Barisal O&M Division BWDB Barisal during the year 2020-21 2021-22 & 2022-23. | 8,52,34,848.00 | 4,34,69,772.48 | 51% | NZK-51% & Millon-49% |
| 10 | NZK-DAWN JV | Bangladesh Water Development Board (BWDB), Naogaon | Division | | Dredging of Atrai River from km 20.000 to km 29.000 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB Naogaon During the FY-2020-21. (Package No Nao-W-13). (Tender/Proposal ID: 549469) | 4,44,84,253.00 | 1,11,21,063.25 | 25% | NZK -25% & DAWN-75% |
| 11 | M/S Nuruzzaman khan | Rural Power Company Limited (RPCL) | (1) Construction of Septic tank & pit under Resettlement-1 at LALDRPC of Patuakhali 1320 MW Coal Based Thermal Power Plant project. (2) Construction of pond and Graveyard in Resettlement-1 at Patuakhali 1320 MW Coal Based Thermal Power Plant project complex. | 1,60,41,804.00 | 1,60,41,804.00 | 100% | 100% |
| Total for 2021-2022 | 125,29,56,318.44 | 113,95,90,444.04 | |||||
| SL | Name of Tender | Name of Authority | Name of Work | Amount of Payment as in Payment Certificate | Value of the Participant | Role of Share | JV Share |
|---|---|---|---|---|---|---|---|
| 1 | NZK-Millon (JV) | Bangladesh Water Development Board (BWDB) | Barisal O&M Division | | Bank Protection Work at the Left Bank of Sugandha River from km 1.300 to km 1.650 total 0.350 km to Protect Captain Mohiuddin Jahangir Dowarika Setu Bridge from Erosion of the Sugandha River at Babugonj Upazila in Barisal District under Barisal O&M Division BWDB Barisal during the year 2020-21 2021-22 & 2022-23. | 1,10,00,000.00 | 56,10,000.00 | 51% | NZK-51% & Millon-49% |
| 2 | M/S Nuruzzaman khan | Project Director, Jolshiri Abashon Project. Bangladesh Army | Land Development of Jolshiri Abashon Project (2nd Agreement) | 178,20,00,000.00 | 178,20,00,000.00 | 100% | 100% |
| 3 | M/S Nuruzzaman khan | Executive Engineer, DND (Project) BWDB, Narayangonj. | Drainage lmprovement of Dhaka-Narayanganj-Demra (DND) Project (Phase-2) | 62,21,991.00 | 62,21,991.00 | 100% | 100% |
| 4 | M/S Nuruzzaman khan | Executive Engineer, Bangladesh Bridge Authority | Supply & Stockpile of Blas ted angular rock for the maintenance of river training works of Bangabandhu Bridge, Bhuapur, Tangail | 5,76,59,688.00 | 5,76,59,688.00 | 100% | 100% |
| 5 | M/S Nuruzzaman Khan | Bangladesh Water Development Board (BWDB) | Nawabganj O&M Division | | Bank Revetment work on the left bank of the Padma River at Charbagdanga from Km.11.567 to Km. 11.762= 195m with D/S End Termination in connection with Protection of Charbandanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of the Padma River under Nawabganj O&M Division BWDB Chapainawabganj during FY 2020-2021 & 2021-2022, Package No: CWP-17, Tender/Proposal ID: 488585 | 2,99,86,132.00 | 2,99,86,132.00 | 100% | 100% |
| 6 | WEL-NZK (JV) | Executive Engineer, Bhola O&M Division-2, BWDB, Charfession, Bhola. | (1) Slope Protection and River Bank Protective Work at Tajumuddin Upazilla sadar along the Meghna River from Km.56.3350 to Km. 56.950 = 0.600 Km in Polder 56/57. during the year 2016-2017 (Package No: TRBW-10/2017-2018). and (2) Slope Protection of Embankment with Bank Revetment Work at Charfession from Km 92.300 to Km 92.600 = 300.00 m of Polder 56/57 in connection with “Protection of Charfession Pourasava Town from the Erosion of Mehgna River in Bhola District” during the year 2016-2017 (Package No. Works-6/2017-2018). | 4,78,20,135.00 | 2,34,31,866.15 | 49% | WEL-51% & NZK -49% |
| 7 | Infratech-NZK JV | Executive Engineer, Bhola O&M Division-01, Bhola, BWDB. | Slope Protection and river bank protection work 1.720 to 2.000, 38.389 to km 38.752 (Package- RI-RBP-8, 14), Division-1, Bhola. | 27,11,399.00 | 13,28,585.51 | 49% | Infra-51% & NZK-49% |
| 8 | NZK-WEL (JV) | Executive Engineer, Bhola O&M Division-01, Bhola, BWDB. | Slope Protection and river bank protection work 30.150 to 34.235 km (Package- Dau-SP-23), Division-1, Bhola. | 4,56,20,621.00 | 2,32,66,516.71 | 51% | NZK -51% & WEL-49% |
| 9 | M/S Nuruzzaman Khan | Rural Power company Ltd. | Construction of one (1) Main Gate , 420m Boundary Wall , Four (4) Watch Towers, one (1) Pond, and one (1) Graveyard in Resettlement-1 at Patuakhali 1320MW Coal Based Thermal Power Plant complex. | 48,13,394.00 | 48,13,394.00 | 100% | 100% |
| 10 | NZK-DAWN JV | Bangladesh Water Development Board (BWDB) | Joypurhat WD Division | | Re-Excavation of Little Jamuna River From Km. 0.200 to Km. 11.750 = 11.550 Km. in Connection With Re-Excavation of Tulshiganga, Little Jamuna, Chiri & Harabati River of Joypurhat District Project during the FY: 2020-2021. | 4,34,00,000.00 | 2,21,34,000.00 | 51% | NZK -51% & DAWN-49% |
| Total for 2020-2021 | 203,12,33,360 | 195,64,52,173.37 | |||||