| 1 |
M/S. Nuruzzaman Khan |
Sand Filling at Project-2 of Jolshiri Abashon as per Location Map as attached annexure A. (1st Contract) |
2025 |
Land Development, Bangladesh Army |
244,02,33,464.00 |
100% |
| 2 |
M/S. Nuruzzaman Khan |
Sand Filling at Project-2 of Jolshiri Abashon as per Location Map as attached annexure A. (1st Contract) |
2025 |
Land Development, Bangladesh Army |
288,43,23,449.00 |
100% |
| 3 |
M/S. Nuruzzaman Khan |
Drainage lmprovement of Dhaka-Narayanganj-Demra (DND) Project (Phase-2). |
2024 |
Drainage lmprovement,DND |
59,90,37,000.00 |
100% |
| 4 |
M/S. Nuruzzaman Khan |
Bank Protection work from km 44.550 to km 44.650 = 0.100 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, |
2024 |
Bank Protection, BWDB |
10,86,00,775.00 |
100% |
| 5 |
M/S. Nuruzzaman Khan |
Bank Protectionwork from km 44.450 to km 44.550 = 0.100 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, |
2024 |
Bank Protection, BWDB |
10,92,31,128.00 |
100% |
| 6 |
M/S. Nuruzzaman Khan |
Bank Protection work from km 26.500 to km 26.750 = 0.250 km in connection with "Protection of Daulatkhan Pourashava, Chokighat and other more vulnerable area from the erosion of the Meghna river in Bhola District" project under Bhola O&M Division-I, BWDB, |
2024 |
Bank Protection, BWDB |
22,69,14,996.00 |
100% |
| 7 |
M/S. Nuruzzaman Khan |
Bank Revetment work on the left bank of the Padma River at Charbagdanga from Km.11.567 to Km. 11.762 195m with D/S End Termination in connection with Protection of Charbandanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the er |
2023 |
Bank Protection, BWDB |
18,71,92,896.00 |
100% |
| 8 |
M/S. Nuruzzaman Khan |
Supply & Stockpile of Blasted angular rock for the maintenance of river training works of Bangabandhu Bridge, Bhuapur, tangail. |
2023 |
Supply Angular Rock |
21,20,59,965.60 |
100% |
| 9 |
NZK-DAWN JV |
Dredging of Atrai River from km 20.000 to km 29.000 9.00 km in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWD |
2023 |
Bank Protection, BWDB |
12,77,39,037.00 |
25% |
| 10 |
NZK-MILON (JV) |
Bank Protection Work at the Left Bank of Sugandha River from km 1.300 to km 1.650 total 0.350 km to Protect Captain Mohiuddin Jahangir Dowarika Setu Bridge from Erosion of the Sugandha River at Babugonj Upazila in Barisal District under Barisal O&M Divisi |
2023 |
Bank Protection, BWDB |
18,18,64,525.00 |
51% |
| 11 |
M/S Nuruzzman Khan (As a Sub-Contractor) |
The execution of the Embankment Construction and Earth Protection works of Patuakhali 1320 MW Coal Fired Thermal Power at Patuakhali. |
2022 |
Land Development, BDP |
55,27,50,286.64 |
100% |
| 12 |
M/S Nuruzzman Khan (As a Sub-Contractor) |
Land Development works of Patuakhali 1320 MW Coal Fired Thermal Power Plant at Patuakhali. (2nd Phase) |
2022 |
Land Development, BDP |
244,39,61,075.60 |
100% |
| 13 |
M/S. Nuruzzaman Khan |
Supply Of Electrical Consumables Items for Land Acquisition, Land Development And Resettlement for Implementation of Patuakhali 1320MW Coal Fired Thermal Power Plant Project (LALDRPC). |
2022 |
Supply Of Electrical Item, RPCL |
3,13,390.00 |
100% |
| 14 |
M/S. Nuruzzaman Khan |
Construction of Septic tank & pit under Resettlement-1 at LALDRPC of Patuakhali 1320 MW Coal Based Thermal Power Plant project. |
2022 |
Construction of Septic Tank & Pit, RPCL |
1,34,21,576.18 |
100% |
| 15 |
M/S. Nuruzzaman Khan |
Construction of pond and Graveyard in Resettlement-1 at Patuakhali 1320 MW Coal Based Thermal Power Plant project complex. |
2022 |
Construction of pond and Graveyard, RPCL |
1,64,62,750.46 |
100% |
| 16 |
M/S. Nuruzzaman Khan |
Construction of 1 X Main Gate With Guard Room including ancillary works for Establishment of Sheikh Hasina Cantonment, Barisal. Job No. EinC/05 of 2017-2018 |
2022 |
Construction Main Gate, Bangladesh Army |
60,27,155.27 |
100% |
| 17 |
HCL-NZK JV |
Land Development work at sector No 01 (Part), 03 (Part), 05(Part) & 07 (Part) of Purbachal New Town Project, (Package No. # 49, Group No # M) under Rajuk, Dhaka. During the year 2008-2009./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2022 |
Land Development, RAJUK |
15,46,47,753.38 |
49% |
| 18 |
M/S. Nuruzzaman Khan |
Earth Filling for Establisment of Sheikh Hasina Cantonment, Barisal (Island No. 01 & 02) |
2022 |
Land Development, Bangladesh Army |
59,53,77,858.69 |
100% |
| 19 |
NZK-WEL JV |
Slope Protection of work from Km 30.150 to km. 34.235 = 4.085 km in Protection Embankment Polder 56/57 from Erosion of the Meghna River at Daulatkhan and Borhanuddin Upazila in Bhola District under Bhola O and M Division-1, BWDB Bhola During the year 2017 |
2021 |
Slope Protection, BWDB |
28,89,59,193.00 |
51% |
| 20 |
ALPHA International-NZK JV |
Sand Filling and Canal/Lake Cutting for the extended area of Jolshiri Abashon Project. (4th Agreement). |
2021 |
Sand Filling, Jolshiri Abashon Project |
44,55,00,000.00 |
51% |
| 21 |
M/S. Nuruzzaman Khan (As a Sub-Contractor) |
Lake/Canal slope protection works and construction of cycle track, walkway & drain (gazipur part) of Purbachal new town project. |
2021 |
Lake/Canal slope protection, Dockyard engineering Works Ltd. |
82,65,07,304.57 |
100% |
| 22 |
NZK-DAWN JV |
Re-Excavation of Little Jamuna River From Km. 0.200 to Km. 11.750 = 11.550 Km. in Connection With Re-Excavation of Tulshiganga, Little Jamuna, Chiri & Harabati River of Joypurhat District Project during the FY: 2020-2021 |
2021 |
Bank Protection, BWDB |
12,14,35,937.09 |
51% |
| 23 |
Infratech-NZK JV |
Bank Protection work from km 1.720 to km 2.000 = 0.280 in connection with the project ''Bank Protection work against Erosion of the Mehgna River at Rajapur and East Ilisha Union of Bhola Sadar Upazilla in Bhola District'' Under Bhola O&M Division-1, BWDB, |
2020 |
Bank Protection, BWDB |
16,31,74,029.00 |
49% |
| 24 |
M/S Nuruzzman Khan (As a Sub-Contractor) |
Sand Dredging and filling of the Service Area under Construction of Multi-Lane Road Tunnel under the River Karnaphuli. (China Communications Construction Company Ltd.) |
2020 |
Sand Dredging and Filling, CCCC |
51,53,07,900.00 |
100% |
| 25 |
M/S. Nuruzzaman Khan (Executed by Power of Attorney from RAB-RC PVT. Ltd) |
Protection of Proposed Economic Zone and Development of Reclaimed Land from Jamuna River in Sirajganj District |
2020 |
Land Development, Bangladesh Army |
201,40,00,000.00 |
100% |
| 26 |
M/S. Nuruzzaman Khan |
Emergency Temporary Bank Protection at South Groyne, Gorilabari, Kalihati, Tangail & Temporary Protection Work along the Dhaleswari Channel behind the Housing Complex of Bangabandhu Bridge, Bhuapur, Tangail. |
2020 |
Emergency Temporary Bank Protection, BBA |
4,83,05,313.29 |
100% |
| 27 |
WEL-NZK JV |
Slope Protection of Embankment with Bank Revetment Work at Charfession from Km 92.300 to km. 92.600 = 300.00 m of Polder 56/57 in Connection with ?Protection of Charfession Pourasava Town form the Erosion of Meghna River in Bhola District?. |
2020 |
Slope Protection, BWDB |
26,58,39,322.67 |
49% |
| 28 |
Infratech-NZK JV |
Bank Protection work from km 38.389 to km 38.540 = 0.151 km, 38.540 to km 38.600 = 0.060 km (Bhuyar khal Armoring) & km 38.600 to km 38.752 = 0.152 km, Total length = 0.363 km in connection with the "Protection of Embankment (from km 29.462 to km 39.000) |
2019 |
Bank Protection, BWDB |
17,87,89,057.00 |
49% |
| 29 |
Infratech-NZK JV |
Bank Protection work from km 0.880 to km 0.880 = 1.300 in connection with the project ''Bank Protection work against Erosion of the Mehgna River at Rajapur and East Ilisha Union of Bhola Sadar Upazilla in Bhola District'' Under Bhola O&M Division-1, BWDB, |
2019 |
Bank Protection, BWDB |
25,84,89,000.00 |
49% |
| 30 |
Infratech-NZK JV |
Bank Protection work from km 0.460 to km 0.880 = 0.420 in connection with the project ''Bank Protection work against Erosion of the Mehgna River at Rajapur and East Ilisha Union of Bhola Sadar Upazilla in Bhola District'' Under Bhola O&M Division-1, BWDB, |
2019 |
Bank Protection, BWDB |
25,89,45,000.00 |
49% |
| 31 |
Infratech-NZK JV |
Bank Protection work from km 248.920 to km 249.340 = 0.420 in connection with the project ''Bank Protection work against Erosion of the Mehgna River at Rajapur and East Ilisha Union of Bhola Sadar Upazilla in Bhola District'' Under Bhola O&M Division-1, B |
2019 |
Bank Protection, BWDB |
26,46,55,151.47 |
49% |
| 32 |
Infratech-NZK JV |
Bank Protection work from km 248.500 to km 248.920 = 0.420 in connection with the project ''Bank Protection work against Erosion of the Mehgna River at Rajapur and East Ilisha Union of Bhola Sadar Upazilla in Bhola District'' Under Bhola O&M Division-1, B |
2019 |
Bank Protection, BWDB |
25,28,67,756.29 |
49% |
| 33 |
M/S. Nuruzzaman Khan |
Supply & Stockpile of Blasted Angular Rock for the Maintenance of River Training Works of Bangabandhu Bridge, Bhuapur./Cheif Engineer, Bangladesh Bridge Authority, Banani, Dhaka |
2019 |
Supply Angular Rock, BBA |
18,37,55,100.00 |
100% |
| 34 |
NZK-RDEL JV |
Dredging work by cutter suction dredger including dredging related works for maintaining navigability form Lohojong tuming point to Kathalbari ferry ghat channel & basin area of shemulia- Kathalbari ferry route in the river Padma for the year 2008-19(Gr-0 |
2019 |
Dredging Work, BIWTA |
5,65,45,774.00 |
51% |
| 35 |
WEL-NZK JV |
Slope Protection and River Bank Protective Work at Tajumuddin Upazilla sadar along the Meghna River from Km. 56.350 to Km. 56.950 = 0.600 Km in Polder 56/57 During the Year 2016-2017 (Package No: 10/2017-2018) |
2019 |
Slope Protection, BWDB |
54,44,67,188.34 |
50% |
| 36 |
M/S. Nuruzzaman Khan (Executed by Power of Attorney from WEL) |
Construction of Talimnagar Drainage Cum Irrigation Pump Station at Talimnagar in connection with Re-excavation of Connecting Rivers, Development of Irrigation, Facility & Fish Culture Project of Gazner Beel Area under Sujanagar Upazila in Pabna District. |
2019 |
Construction & Re-excavation, Talimnagar Drainage |
104,51,24,908.15 |
100% |
| 37 |
RABRC-SA-NZK (JVCA) |
Re-excavation of Khal Group-03 and Re-excavation of Khal Group-4 under Irrigation Management Improvement Project for Muhuri Irrigation Project during 2015-16, 2016-17, 2017-18 and 2018-19 under PMU, (IMIP), BWDB. |
2019 |
Re Excavation of Khal, RAJUK |
20,48,79,779.01 |
34% |
| 38 |
M/S. Nuruzzaman Khan |
Shore Protection work (precast/cast in situ) of Excavation and development of 100" wide khal along the both side of Purbachal link Road (from Kuril to Balu River) project (Chainage 9+790km to 11+260km both side of South side canal and 9+627km to 11+162km |
2019 |
Shore Protection, Bangladesh Army |
132,03,42,000.00 |
100% |
| 39 |
M/S Nuruzzman Khan (As a Sub-Contractor) |
Land Development works of Patuakhali 1320 MW Coal Fired Thermal Power Plant at Patuakhali. (1st Phase) |
2019 |
Land Development, BDP |
105,05,00,750.12 |
100% |
| 40 |
Infratech-NZK JV |
Bank Protection work from km 1.300 to km 1.720 = 0.420 in connection with the project ''Bank Protection work against Erosion of the Mehgna River at Rajapur and East Ilisha Union of Bhola Sadar Upazilla in Bhola District'' Under Bhola O&M Division-1, BWDB, |
2019 |
Bank Protection, BWDB |
25,25,52,260.00 |
49% |
| 41 |
M/S. Nuruzzaman Khan |
Sand Filling for the extended area of Jolshiri Abashon Project. |
2018 |
Sand Filling, Jolshiri Abashon Project |
13,11,60,000.00 |
100% |
| 42 |
M/S. Nuruzzaman Khan |
Land Development & Building Dike Work of Jolshiri Abashon Project (2nd Agreement- Extension) |
2018 |
Land Development, Jolshiri Abashon Project |
188,46,00,000.00 |
100% |
| 43 |
M/S. Nuruzzaman Khan |
Emergency Temporary Bank Protection Work of South Groyne Groyne (at d/s of Bangabandhu Bridge Using Sand Filling Geo-Bags for the Protection of Villages of Gorilabari, Kalihati, Tangail, during the year 2017-2018./Chief Engineer, Bangladesh Bridge Authori |
2018 |
Emergency Temporary Bank Protection, BBA |
2,72,06,679.06 |
100% |
| 44 |
M/S. Nuruzzaman Khan |
Improvement of road from Rupganj Poarshi road Rajuk Sector-02 to Jal-Shiri Abashan road by earth filling at ch. 00-1400m under Rupganj Upazila, Dist: Narayanganj. (Package No: NA-Jal-02). |
2018 |
Improvement of road, Jalshiri Abashan |
3,97,02,871.64 |
100% |
| 45 |
M/S. Nuruzzaman Khan |
Improvement of road from Yusofganj-Poarshi Bazer to Jal-Shiri Abashan road by earth filling at ch. 00-2000m under Rupganj Upazila, Dist: Narayanganj. (Package No: NA-Jal-01). |
2018 |
Improvement of road, Jalshiri Abashan |
5,34,63,789.02 |
100% |
| 46 |
M/S. Nuruzzaman Khan |
Land Development works, Lake Development works, River Bank Protection: works at sector no-13 (Part), 14 (Part), 15 (Part), 16 (Part), 17 (Part), 18 (Part), 24 (Part), 25 (Part) & 26 (Part) of Gazipur Part of Purbachal New Town Project. Package No. 50, Lot |
2018 |
Land Development, RAJUK |
69,98,69,482.07 |
100% |
| 47 |
ADL-NZK JV |
Dredging of Upper Vaulai River (D/S) (from km 0.000 to km 16.000=16.000 km) in upazilla: Jamalganj & Dharmapasha, Dist: Sunamganj under ?Pre-monsoon flood protection and Drainage improvement in haor areas (1st Revised)? during the year 2016-2017 & 2017-20 |
2018 |
Dredging Work, BWDB |
26,49,44,489.89 |
49% |
| 48 |
M/S. Nuruzzaman Khan |
Earth Filling for establishment of proposed Sheikh Hasina Senanibash at Barisal-Patuakhali area under area HQ Jossore, 285/OTHERS of 2016-2017. /Army Headquarters, E in C?s Branch, Works Directorate, Dhaka Cantt. |
2018 |
Earth Filling, Bangladesh Army |
23,50,00,000.13 |
100% |
| 49 |
M/S. Nuruzzaman Khan |
Earth Filling for establishment of proposed Sheikh Hasina Senanibash at Barisal-Patuakhali area under area HQ Jossore, (JOB NO.155/OTHERS of 2016-2017. /Army Headquarters, E in C?s Branch, Works Directorate, Dhaka Cantt. |
2018 |
Earth Filling, Bangladesh Army |
46,07,14,983.70 |
100% |
| 50 |
WEL-NZK JV |
River bank protective work along the right bank of Jamuna river at Raghunathpur from km 7.750 to km 8.125=375.00m from the erosion of the Jamuna river in connection with the Project. River bank protective work of left bank erosion of the Padma river at d |
2017 |
River Bank Protective, BWDB |
6,55,64,806.59 |
49% |
| 51 |
NZK-WEL JV |
River bank protective work along the right bank of Jamuna river at Raghunathpur from km 7.000 to km 7.375=375.00m from the erosion of the Jamuna river in connection with the Project. River bank protective work of left bank erosion of the Padma river at d |
2017 |
River Bank Protective, BWDB |
6,72,16,866.34 |
49% |
| 52 |
M/S. Nuruzzaman Khan |
Earth Filling for establishment of proposed Sheikh Hasina Senanibash at Barisal-Patuakhali area under area HQ Jossore, (JOB NO.26/RES BLDG of 2016-2017./Army Headquarters, E in C?s Branch, Works Directorate, Dhaka Cantt. |
2017 |
Earth Filling Work, Bangladesh Army. |
4,24,82,326.20 |
100% |
| 53 |
WEL-NZK JV |
Permanent Bank Protection Work of Bhuapur Hard Point (BHP) of Bangabandhu Bridge from Ch. 450.00m to Ch. 1400m at Bhuapur, Tangail by Dumping Blasted Angular Rock, Providing C.C. Revetment and Geobag Dumping. During the year 2016-2017. Chief Engineer, Ban |
2017 |
Permanent Bank Protection Work, BBA |
29,87,17,284.52 |
49% |
| 54 |
NZK-WEL JV |
Internal Lake Development Work with land development work at sector-21 (Part) of Purbachal New Town Project, Rupganj, Narayanganj (Package No-PE, lake-01, lot-01) |
2017 |
Lake Development, Purbachal New Town Project |
19,36,91,257.32 |
49% |
| 55 |
M/S. Nuruzzaman Khan |
Emergency Temporary Bank Protection Work of Dhaleshwari Spill Channel Using Sand Filled Geo-Bags for the Protection of BBA Housing Complex, Kalihati, Tangail, during the year 2017-2018./Chief Engineer, Bangladesh Bridge Authority, Banani, Dhaka. |
2017 |
Emergency Temporary Bank Protection, BBA |
69,96,714.91 |
100% |
| 56 |
WEL-NZK-PTSL JV |
River bank protection works by placing and dumping of Cement Concrete (CC) blocks and geo-textile bags along teh left ban of the Jamuna River at Zafarganj from km.6.100 to 8.100 km -2.000 km in upazila shibalaya, District- Manikganj under Manikganj WD Div |
2017 |
Bank Protection, BWDB |
46,68,69,226.40 |
45% |
| 57 |
M/S. Nuruzzaman Khan |
Development of lake and constriction of walkway at sector no-12(part), 16(part) & 17(part) in Purbachal New Town Project (Chainage 0.00 m to 1087.00 m) Package # LCD-01, Lot-M)./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2017 |
Development of Lake and constriction, Purbachal New Town Project |
9,36,74,730.45 |
100% |
| 58 |
M/S. Nuruzzaman Khan (Executed by Power of Attorney from ARK-IH JV) |
Land Development Works at Sector no-23 (Part), 24 (Part), 25 (Part) 27 (Part), 28, 29 (Part) & 30 (Part) of Gazipur Part of Purbachal New Town Project (Package No. 53, Lot No. GA-04) |
2017 |
Land Development, Purbachal New Town Project |
65,36,28,518.26 |
100% |
| 59 |
M/S. Nuruzzaman Khan (Execute by Power of Attorney from ARK-IH JV) |
Land Development Works at Sector no-24 (Part), 25 (Part) & 27 (Part) of Gazipur Part of Purbachal New Town Project (Package No. 52, Lot No. GA-03) |
2017 |
Land Development, Purbachal New Town Project |
75,13,69,909.30 |
100% |
| 60 |
M/S. Nuruzzaman Khan (Executed by Power of Attorney from ARK-IH JV) |
Land Development Works at Sector no-15 (Part), 25 (Part), 26 (Part), A 27 (Part) of Gazipur Part of Purbachal New Town Project (Package No. 51, Lot No. GA-2) |
2017 |
Land Development, Purbachal New Town Project |
80,71,50,758.13 |
100% |
| 61 |
M/S. Nuruzzaman Khan (Executed by Power of Attorney from WEL) |
Land Development works by Earth/Sand Filling of Main plant area of block-B for 2nd phase Thermal Power Plant Project at Rampal, Bagerhat under Direct Procurement Method (DPM) |
2017 |
Land Development, RampalThermal Power Plant Project at Rampal |
336,91,14,256.00 |
100% |
| 62 |
M/S. Nuruzzaman Khan |
Land Development Work of Jolshiri Abashon Project Contract Agreement (2nd) |
2017 |
Land Development, Jolshiri Abashon Project |
179,45,00,000.00 |
100% |
| 63 |
M/S. Nuruzzaman Khan |
Dredging work by cutter suction dredger including dredging related works for maintaining navigability of Mongla-Ghasiakhali Canal. During the year 2015-2016./Managing Director, DWE, Bangladesh Navy. |
2016 |
Dredging Work, Bangladesh Navy |
29,07,20,000.00 |
50% |
| 64 |
M/S Nuruzzaman Khan (Executed by Power of Attorney from WEL) |
Construction of Closure at Musapur Over Little Feni River including Re-excavtion of Diversion channel (U/S & D/S) in Connection with Musapur Regulator under "New Dakatia & Old Dakatia Little Feni River Drainage Project" under Noakhali O&M Division, BWDB, |
2016 |
Construction of Closure, BWDB |
186,21,23,374.00 |
100% |
| 65 |
WEL-NZK JV |
Dredging work by cutter suction dredger and excavator navigability of Mongla-Ghasiakhali Canal (Group-2). During the year 2015-2016./Managing Director, DWE, Bangladesh Navy. |
2016 |
Dredging Work, Bangladesh Navy |
45,33,24,000.00 |
50% |
| 66 |
M/S. Nuruzzaman Khan |
Provision of earth filling and site development for 17 inf division at sylhet cantonment (2nd Phase) Group-1), during the year 2017-2018./AHQ, QMG?S BrDW & CE (Army), Dhaka Cantonment. |
2015 |
Provision of Earth Filling, Bangladesh Army |
34,99,80,000.00 |
100% |
| 67 |
M/S. Nuruzzaman Khan |
Lake Cutting-Army work. During the year 2013-2014./Project Director, Jolshiri Abashon Project. Bangladesh Army. |
2014 |
Lake Cutting, Jolshiri Abashon Project |
16,50,00,000.00 |
100% |
| 68 |
M/S. Nuruzzaman Khan |
Land Development works of Jolshiri Abashon Project. Tender Package No. 01, 02, 03 & 04. During the year 2013-2014. /Project Director, Jolshiri Abashon Project. Bangladesh Army. |
2014 |
Land Development, Jolshiri Abashon Project |
291,60,00,000.00 |
100% |
| 69 |
M/S. Nuruzzaman Khan |
Land Development works at sector no-02 (Part), 07 (Part), 08 (Part), 09 (Part), 10 (Part) of Purbachal New Town Project. Package No. 47, Group No. K during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Land Development, RAJUK |
5,60,17,194.85 |
100% |
| 70 |
M/S. Nuruzzaman Khan |
Land Development works at sector no-19 (Part), 20 (Part), 22 (Part), 23 (Part) of Purbachal New Town Project. Package No. 41, Group No. E during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Land Development, RAJUK |
7,27,27,138.57 |
100% |
| 71 |
M/S. Nuruzzaman Khan |
Land Development works at sector no-06 (Part), 08 (Part), 09 (Part), 19 (Part), 20 (Part) & 22 (Part) of Purbachal New Town Project. Package No. 42, Group No. F during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Land Development, RAJUK |
7,52,13,891.16 |
100% |
| 72 |
M/S. Nuruzzaman Khan |
Land Development works at sector no-18 (Part), 19 (Part), 22 (Part), 23 (Part) & 24 (Part) of Purbachal New Town Project. Package No. 40, Group No. D during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Land Development, RAJUK |
5,06,42,082.00 |
100% |
| 73 |
M/S. Nuruzzaman Khan |
Land Development at Kamta Mouja Package No. 34, Group No. K-3 in connection with Purbachal New Town Project, under Rajuk, Dhaka. during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Land Development, RAJUK |
3,13,96,714.66 |
100% |
| 74 |
M/S. Nuruzzaman Khan |
Supplying, Fitting and Fixing Single layer Tarza doubly woven matting with necessary ties including the cost of all material to work site under Narayangonj Dredger division, BWDB, during the year 2012-2013./Deputy Director, RAC, BWDB, Narayangonj. |
2013 |
Supplying Woven Matting, BWDB |
64,46,736.00 |
100% |
| 75 |
M/S. Nuruzzaman Khan |
Construction of Internal Road at sector 11 (part) Gr. No. 06 in Majgoan Mouja in connection with Purbachal New Town Project under Rajuk, Dhaka during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Construction of Internal Road, RAJUK |
1,57,85,895.21 |
100% |
| 76 |
M/S. Nuruzzaman Khan |
Construction of Internal Road at sector 11 (part) Gr. No. 05 in Majgoan Mouja in connection with Purbachal New Town Project under Rajuk, Dhaka during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Construction of Internal Road, RAJUK |
2,25,83,388.56 |
100% |
| 77 |
M/S. Nuruzzaman Khan |
Construction of Internal Road at sector 13 (part), 14(part) Gr. No. 03 in Bholanathpur Mouja in connection with Purbachal New Town Project under Rajuk, Dhaka during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Construction of Internal Road, RAJUK |
3,18,82,331.52 |
100% |
| 78 |
M/S. Nuruzzaman Khan |
Construction of Internal Road at sector 14 (part), 13(part) Gr. No. 02 in Bholanathpur Mouja in connection with Purbachal New Town Project under Rajuk, Dhaka. during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Construction of Internal Road, RAJUK |
2,82,42,797.00 |
100% |
| 79 |
M/S. Nuruzzaman Khan |
Construction of Internal Road at sector 14 (part), 13(part) Gr. No. 01 in Bholanathpur Mouja in connection with Purbachal New Town Project under Rajuk, Dhaka during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Construction of Internal Road, RAJUK |
1,38,20,108.00 |
100% |
| 80 |
M/S. Nuruzzaman Khan |
Land development work at Purbachal Link Road (Debogram- Progoti Shoroni Connecting Road) Project. Package No.LR-01. Lot No. A during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Land Development, RAJUK |
2,33,84,183.00 |
51% |
| 81 |
M/S. NZK-IH JV |
Land development work at Purbachal Link Road (Debogram- Progoti Shoroni Connecting Road) Project. Package No.LR-01. Lot No. C during the year 2012-2013./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2013 |
Improvement of Road, LGED |
2,22,03,390.30 |
51% |
| 82 |
M/S. Nuruzzaman Khan |
Improvement of Rampura-Volta (RHD) road-Nawra (Baraid GC) via Majina road (Ch. 0+000 km to +200 km), Upazila: Rupgonj, District: Narayanganj. Package No. W-NARA- Rupganj-UZR-09-98(a)?.during the year 2012-2013. Executive Engineer, LGED, Narayangonj. |
2013 |
Improvement of Road, LGED |
3,07,40,013.00 |
100% |
| 83 |
SSECL-NZK (JV) (Partner) |
Construction of River Bank Protection work from km. 3.930 to km 4.4330 located at ibrahimpur in Chandpur Sadar upazilla in connection with ?Protection of Chandpur Irrigation Project from Erosion of the Meghna River at Ibrahimpur-Akhua adjacent to puran Ba |
2012 |
River Bank Protection , BWDB |
5,43,45,000.00 |
49% |
| 84 |
M/S. Nuruzzaman Khan (Sub Contractor PTSL-ATCO JV Power of Attorney) |
Construction of Bridges over lakes and canals on internal Road at Purbachal New Town Project. Package No: RAJUK/Purbachal/Br. C-01, Lot-07, Bridge No-47 during the year 2011-12 |
2012 |
Construction of Bridges, RAJUK |
6,12,77,000.00 |
100% |
| 85 |
M/S. Nuruzzaman Khan (Sub Contractor PTSL-ATCO JV Power of Attorney) |
Construction of Bridges over lakes and canals on internal Road at Purbachal New Town Project. Package No: RAJUK/Purbachal/Br. C-01, Lot-07, Bridge No-47 during the year 2011-12 |
2012 |
Construction of Bridges, RAJUK |
6,12,77,000.00 |
100% |
| 86 |
M/S. Nuruzzaman Khan (Sub Contractor PTSL-ATCO JV Power of Attorney) |
Construction of Bridges over lakes and canals on internal Road at Purbachal New Town Project. Package No: RAJUK/Purbachal/Br. C-01, Lot-06, Bridge No-45 during the year 2011-12 |
2012 |
Construction of Bridges, RAJUK |
11,22,94,000.00 |
100% |
| 87 |
M/S. Nuruzzaman Khan (Sub Contractor PTSL-ATCO JV Power of Attorney) |
Construction of Bridges over lakes and canals on internal Road at Purbachal New Town Project. Package No: RAJUK/Purbachal/Br. C-01, Lot-05, Bridge No-22 during the year 2011-12 |
2012 |
Construction of Bridges, RAJUK |
5,69,58,000.00 |
100% |
| 88 |
M/S. Nuruzzaman Khan (Sub Contractor PTSL-ATCO JV Power of Attorney) |
Construction of Bridges over lakes and canals on internal Road at Purbachal New Town Project. Package No: RAJUK/Purbachal/Br. C-01, Lot-04, Bridge No-07 during the year 2011-12 |
2012 |
Construction of Bridges, RAJUK |
5,99,34,000.00 |
100% |
| 89 |
M/S. Nuruzzaman Khan (Sub Contractor PTSL-ATCO JV Power of Attorney) |
Construction of Bridges over lakes and canals on internal Road at Purbachal New Town Project. Package No: RAJUK/Purbachal/Br. C-01, Lot-03, Bridge No-06 during the year 2011-12 |
2012 |
Construction of Bridges, RAJUK |
5,85,06,000.00 |
100% |
| 90 |
M/S. Nuruzzaman Khan (Sub Contractor PTSL-ATCO JV Power of Attorney) |
Construction of Bridges over lakes and canals on internal Road at Purbachal New Town Project. Package No: RAJUK/Purbachal/Br. C-01, Lot-02, Bridge No-04 during the year 2011-12 |
2012 |
Construction of Bridges, RAJUK |
6,06,74,000.00 |
100% |
| 91 |
M/S. Nuruzzaman Khan (Sub Contractor PTSL-ATCO JV Power of Attorney) |
Construction of Bridges over lakes and canals on internal Road at Purbachal New Town Project. Package No: RAJUK/Purbachal/Br. C-01, Lot-01, Bridge No-03 during the year 2011-12 |
2012 |
Construction of Bridges, RAJUK |
4,23,47,000.00 |
100% |
| 92 |
M/S. Nuruzzaman Khan |
Construction of Land Development work with Earth/Sand by truck & Dredging loading & unloding, Factory Building, Multi Storied statt quaterand other necessary construction work during the year 2011-2012 of NZ Textile Ltd. |
2012 |
Land Development & Factory Building, RAJUK |
55,00,00,000.00 |
100% |
| 93 |
M/S. Nuruzzaman Khan |
Construction of Land Development work with Earth/Sand by truck & Dredging loading & unloding, Factory Building, Multi Storied statt quaterand other necessary construction work during the year 2012-2013 of NZ Textile Ltd. |
2012 |
Construction of Land Development, NZ Textile Ltd |
62,60,00,000.00 |
100% |
| 94 |
SSECL-NZK Joint Venture (Partner) |
River Bank Protection works with Raising of Embankment Height along the left bank of Surma River from M 600 to M 900 and M 1200 at Sunamgonj Town under Sunamgonj O&M Division, WDB, Sunamgonj, During the year 2010-2011. /Executive, Engineer, Sunamgonj O&M |
2011 |
River Bank Protection, BWDB |
3,51,06,574.87 |
51% |
| 95 |
M/S. Nuruzzaman Khan |
Construction of Embankment at left bank of Selonia river from km. 14.350 to 15.005 & km. 15.090 to 16.935 in c/w muhuri -kahua FCDI Project under Feni O&M Division BWDB during 2010-2011. /Executive, Engineer, Feni O&M Division, BWDB, Feni. |
2011 |
Construction of Embankment, BWDB |
99,00,149.02 |
100% |
| 96 |
M/S. Nuruzzaman Khan |
Construction of Embankment at Right bank of khaua river from km. 2.870 to km 14.220 & 14.280 to 14.930 km in c/w muhuri-kahua FCDI Project under Feni O&M Division BWDB during 2010-2011. /Executive, Engineer, Feni O&M Division, BWDB, Feni. |
2011 |
Construction of Embankment, BWDB |
1,43,50,566.11 |
100% |
| 97 |
M/S. Nuruzzaman Khan |
Re-excavation of Modinar Khal from km 2.100 to km 7.100= 5.00 km in Chenchuri Beel Sub-Project, under SWAIWRPMP during the year 2010-11./ Executive, Engineer, Chenchuri Beel Sub-Project, BWDB, Narail. |
2011 |
Reexcavation Khal, BWDB |
77,38,819.07 |
100% |
| 98 |
M/S. Nuruzzaman Khan (Prime) |
Bank Protection work by C.C block and sand filled Geo-bags in upazila Faridpur Sadar & Charbhadra- son in connection with protection of Foridpur town under O&M Division, BWDB, Faridpur. During the year 2009-2010./Executive Engineer, Faridpur O&M Division, |
2010 |
Bank Protection, BWDB |
3,59,11,109.53 |
49% |
| 99 |
M/S. Nuruzzaman Khan |
Bank Protection work in connection with Dardaria beel Sub- Project Package C2-23 (DHA-1-04) under BWDB Narsingdi O&M Division. During the year 2009-2010. /Executive Engineer, DHV-DPM-RPMC |
2010 |
Bank Protection, BWDB |
92,49,802.48 |
100% |
| 100 |
PTSL-NZK Joint Venture (Partner) |
Excavation of Down stream (D/S) Diversion channel of Musapur Regulator from km 0.042 to km 1.435 = 1.393 km at Musapur, Companigonj, Noakhali, BWDB, During the year 2009-2010 |
2010 |
Excavation River , BWDB |
8,06,07,000.00 |
51% |
| 101 |
PTSL-NZK Joint Venture (Partner) |
Excavation of Up stream (U/S) Diversion channel of Musapur Regulator from km 0.050 to km 1.015 = 0.965 km at Musapur, Companigonj, Noakhali, BWDB During the year 2009-2010./Executive, Engineer, Noakhali O&M Division, BWDB, Noakhali. |
2010 |
Excavation River , BWDB |
4,88,87,000.00 |
51% |
| 102 |
M/S. Nuruzzaman Khan (Prime) |
Land Development at Maizgaon Mouja (Group No. 02) in connection with Purbachal New Town Project under Rajuk, Dhaka. During the year 2008-2009. /Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2009 |
Land Development, RAJUK |
11,08,71,187.56 |
100% |
| 103 |
M/S. Nuruzzaman Khan (Prime) |
Construction of Internal Road at sector 17 (part) Gr. No. 08 in Maijgaon Mouja in connection with Purbachal New Town Project under Rajuk, Dhaka. During the year 2008-2009./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2009 |
Construction of Internal Road, RAJUK |
1,85,43,897.38 |
100% |
| 104 |
M/S. Nuruzzaman Khan (Prime) |
Public works under water Development Board, Dhaka During the year 2008-2009./Deputy Director, PWDB. |
2009 |
Public Works, PWDB |
50,16,035.00 |
100% |
| 105 |
M/S. Nuruzzaman Khan (Prime) |
Development of Military Land, Construction of Boundary wall & Tin shed shop at Chasara, Narayangonj. During the year 2008-2009. Station Commander, Station Headquarters, Dhaka Cantonment. |
2009 |
Construction of Boundary wall, Bangladesh Army |
1,25,00,000.00 |
100% |
| 106 |
PTSL- NZK Joint Venture |
Riverbank slope protection by placing & Dumping of Cement Concrete block & Geo-bags under Meghna Donagoda O&M circle BWDB, Chandpur. During the year 2007-2008.Projetc Director, PMO-JMREMP, BWDB, Dhaka. |
2008 |
River bank slope protection, BWDB |
7,37,13,015.46 |
49% |
| 107 |
M/S. Nuruzzaman Khan (Prime) |
Land Development work by sand/earth at Gutiab Mouja (Group No. 01) in connection with Purbachal New Town Project, under Rajuk, Dhaka.During the year 2007-2008./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2008 |
Land Development, RAJUK |
10,34,05,357.08 |
100% |
| 108 |
M/S. Nuruzzaman Khan (Prime) |
Land Development at work by sand/earth at Maijgaon Mouja (Group No. 01) in connection with Purbachal New Town Project, under Rajuk, Dhaka. During the year 2007-2008./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2008 |
Land Development, RAJUK |
7,84,78,413.00 |
100% |
| 109 |
M/S. Nuruzzaman Khan (Prime) |
Land Development at Gutiab Mouja (Group No. 02) in connection with Purbachal New Town Project, under Rajuk, Dhaka. During the year 2007-2008. /Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2008 |
Land Development, RAJUK |
9,97,80,170.62 |
100% |
| 110 |
M/S. Nuruzzaman Khan (Prime) |
Land Development at Bholanathpur Mouja (Group No. 04) in connection with Purbachal New Town Project, under Rajuk, Dhaka. During the year 2007-2008./Project Director, Purbachal New Town Project, Rajuk Bhaban, Dhaka. |
2008 |
Land Development, RAJUK |
8,42,27,965.50 |
100% |
| 111 |
M/S. Nuruzzaman Khan (Sub Contractor M/S Ismail Hossain Power of Attormey) |
Construction of 46.365m long RCC Girder Bridge at 6th km (Gap no 6/1) of Rampura-Bhulta-Arihahazar-Gopaldi-Bancharampur-Nabinager-Rodhika Road under division Narayangonj. During the Year 2006-2007 |
2007 |
Construction Girder Bridge, LGED |
3,54,46,000.00 |
100% |
| 112 |
M/S. Nuruzzaman Khan (Prime) |
Re-Sectioning of embankment of Nagor Valley sub-Project under O&M Division BWDB, Naogaon. During the year 2007-2008./Executive, Engineer, Naogaon O&M Division, BWDB, Naogaon. |
2007 |
Re-Sectioning of Embankment, BWDB |
1,77,77,774.00 |
100% |
| 113 |
NZK, MAC & Moksood JV. (Prime) |
Construction of Cross Dam over Bhurikhari Khal form ch. 0.00m to ch. 300.00m under? Juri river Re-excavation and constriction of cross-dam project at Enchugonj of Sylhet District? during the year 2005-2006./Executive, Engineer, Sylhet O & M Division, BWDB |
2006 |
Construction of Cross Dam Over , BWDB |
1,75,56,040.61 |
34% |
| 114 |
NZK, MAC & Moksood JV. (Prime) |
Re-Sectioning of Embankment for a length of 5.790 km of Embankment construction form Balagonj to Kalnirchar, Upazila Balagonj, Dist. Sylhet and Rehabilitation of Protective work a length of 94.80 at Kailastila of Golapgonj Upzila of surma river system upz |
2006 |
Re-Sectioning of Embankment, BWDB |
1,13,91,446.26 |
34% |
| 115 |
M/S. Nuruzzaman Khan (Prime) |
Bank Protection work of Armed Dyke km1.030 km to 1.200 =170 miter, under Netrokona O&M Division, BWDB. During the year 2004-2005./Executive Engineer, Netrokona O&M Division, BWDB, Netrokona. |
2005 |
Bank Protection, BWDB |
70,25,082.72 |
100% |
| 116 |
M/S. Nuruzzaman Khan (Prime) |
Manufacturing & supplying of 6200(six thousand two hundred) Nos 45cm.x45cm cube size, 1900(one thousand nine hundred) Nos 50cm.x50cm cube size & 3032(three thousand thirty two) Nos 45cm.x30cm cube size of C.C. Block in Connection with Chandpur Twon Prote |
2004 |
Manufactur & supplying Block, BWDB |
34,03,702.44 |
100% |
| 117 |
M/S. Rising Construction &M/S. Nuruzzaman Khan JV (Partner) |
Improvement of Feeder Road Type- A. Third Road Rehabilitation and Maintenance Project. Improveme- nt of 5 Accident Black spots on N-8. Under Barishal RHD Zone. During the year 2004-2005/Additional Chief Engineer, RHD.(C.C), Barisal Zone, Barisal. |
2004 |
Improvement of Feeder Road, RHD |
3,73,14,357.78 |
50% |
| 118 |
M/S. Nuruzzaman Khan (Prime) |
Protection of Hasnapara, Chandanbaisa, Shalarabari & Baniajan area in Bogra District from the erosion of the Jamuna River, during the year 2000-20001 & 2001-2002./Executive Engineer, Bgora O&M Division BWDB, Bogra. |
2003 |
Protection River, BWDB |
14,70,00,000.00 |
100% |
| 119 |
M/S. Ismail Hossain & M/S. Nuruzzaman Khan JV (Partner) |
Land development of 230/132 KV Sub-Station site at Aminbazar by Hydraulic filling. During the year 2003-2004./Project Director, Project-2, PGCBL. |
2003 |
Land Development, PGCB |
12,14,52,100.00 |
49% |
| 120 |
M/S. Nuruzzaman Khan (Prime) |
Manufacturing & supplying C.C. Block in Connection with protective work for Chandpur Town Projection project, during the year 2000-2001/Executive Engineer, Chandpur O&M Division BWDB, Chandpur. |
2001 |
Manufactur & supplying Block, BWDB |
71,15,517.00 |
100% |
| 121 |
M/S. Nuruzzaman Khan & New Generation Construction Co. Ltd. J.V. (Partner) |
Coastal Embankment Rehabilitation Project(CREP) Contract -18 at Cox?s Bazar in BWDB Polder-68,during the year 1999-2000./Executive Engineer, WD 2, CERP, BWDB, Cox?s Bazar. |
2000 |
Coastal Embankment, BWDB |
27,76,00,000.00 |
99% |
| 122 |
M/S. Nuruzzaman Khan (Prime) |
River Bank Revetment work of from Groyne No.1 to shimla-Park from M-979.00 to M-2067.00 of Rajshah Town Protection Scheme in connection with River Bank Protection Project, Rajshahi O&M Circle, BWDB, Rajshahi, during the year 1998-2001./Executive Engineer |
2000 |
River Bank Revetment, BWDB |
7,95,19,957.00 |
100% |
| 123 |
M/S. Nuruzzaman Khan (Prime) |
River Bank Protection by Bank Revetment at Roosevelt jetty stretch Package No. G-2, Under Khulna O&M Division-11 BWDB, khulna. During the year 1995-1996./Executive Engineer, Khulna O & M Division-II, BWDB, Khulna. |
1996 |
River Bank Protection, BWDB |
4,06,10,237.00 |
100% |
| 124 |
M/S. Nuruzzaman Khan (Sub Contractor) |
Construction of Pump House at Baniadi of Shimju Company under BWDB, Dhaka during the year 1991-1995 as sub-contractor. |
1995 |
Construction of Pump Station |
20,12,18,000.00 |
100% |
| 125 |
M/S. Nuruzzaman Khan (Sub Contractor) |
Construction of Pump Station at Goran Chatbari Pump House, Mirpur, Dhaka O&M Division-1, BWDB during the year 1994-1995 as Sub-contractor. |
1995 |
Construction of Pump Station |
33,25,27,000.00 |
100% |
| 126 |
M/S. Nuruzzaman Khan |
Construction of Excavation and Construction of Dinajpur Canal in Group No. DC-2, DC-4 during the year 1994-1995 under Nilphmari Water Dev. Division BWDB, Nilphamari. |
1995 |
Construction of Excavation, BWDB |
54,60,000.00 |
100% |
| 127 |
M/S. Nuruzzaman Khan |
Construction of Sluice Gate at Kutubdia Cox,s Bazar During the year 1993-1994 under O&M Division Cox Bazar, BWDB. |
1995 |
Construction of Sluice Gate, BWDB |
5,75,93,000.00 |
100% |
| 128 |
M/S. Nuruzzaman Khan |
Construction of Sluice Gate at Kutubdia Cox,s Bazar During the year 1993-1994 under O&M Division Cox Bazar, BWDB. |
1994 |
Construction of Sluice Gate, BWDB |
6,33,65,000.00 |
100% |
| 129 |
M/S. Nuruzzaman Khan |
Construction of Dinajpur Canal under Teesta Barrage Project, Nilphamari O&M Division, BWDB, During the year1991-1992. |
1992 |
Construction of Canal, BWDB |
8,78,27,000.00 |
100% |
| 130 |
M/S. Nuruzzaman Khan |
Work Construction of Box Culvert along Mohakhail Khal during the 1990-1991 under Drainage Division-1, Dhaka, WASA. |
1991 |
Construction of Box Culvert, WASA |
2,18,00,000.00 |
100% |
| 131 |
M/S. Nuruzzaman Khan |
Construction of 2-vent (Size-180m X 1.50m) R.C.C Regulator at Sreenagor-Mowa-Bhaggakul over pagla khal under during the 1989-1990 Mowa O&M Division, BWDB. |
1990 |
Construction of 2-vent, BWDB |
59,44,000.00 |
100% |
| 132 |
M/S. Nuruzzaman Khan |
2 Main Irrigation Canal with Mechanical compacted Embankment under Rupgonj Project, during the year 1989-1990 under Rupgonj water Dev. Division, BWDB, Uttara, Dhaka. |
1990 |
Irrigation Canal, BWDB |
1,43,00,000.00 |
100% |
| 133 |
M/S. Nuruzzaman Khan |
Excavated Joaria Khal in connection with Aglarchawk Irrigation Project, during the year 1988-1989 under Dhaka, O&M Division-01, BWDB. |
1989 |
Excavated Khal, BWDB |
1,87,00,000.00 |
100% |
| 134 |
M/S. Nuruzzaman Khan (Sub Contractor) |
Construction of Pump House at Rupgonj Kailgonj of china company under BWDB, Dhaka during the year 1986-1987 as sub-contractor. |
1987 |
Construction of Pump House, BWDB |
15,17,18,000.00 |
100% |