| 1 |
Land Development Works at The Project area of Netrokona University, Netrokona Under The Project of "Establishment of Netrokona University, Netrokona" Project. |
239,55,46,832.313 |
23-09-2021 |
Establishment of Netrokona University Project, Netrokona |
| 2 |
Construction of Retaining Wall (RCC Frame with Brick Wall) and 5 Nos. RCC Pipe Culvert of Netrokona University, Netrokna under the project of "Establishment of Netrokona University, Netrakona" during the year 2022-23. |
38,90,07,169.297 |
23-10-2023 |
Establishment of Netrokona University Project, Netrokona |
| 3 |
River Bank Protective Work from km 0.000 to km 0.500 = 0.500 km at Khaulia near Sannashi Bazar Area along the Right Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation/Dredg |
27,15,70,267.250 |
05-09-2023 |
Bangladesh Water Development Board (BWDB), Bagerhat O and M Division |
| 4 |
River Bank Protective Work from km 0.500 to km 1.000 = 0.500 km at Khaulia near Sannashi Launch Ghat Area along the Right Bank of Panguchi River in C/W "Protection of Morrelganj Upazila sadar & Adjacent Areas from Erosion of panguchi River & Re-excavation |
25,92,36,754.700 |
05-09-2023 |
Bangladesh Water Development Board (BWDB), Bagerhat O and M Division |
| 5 |
Sand Filling at Project-2 of Jolshiri Abashon as per Location Map as attached annexure A. (2nd Phase) |
102,00,00,000.00 |
16-02-2026 |
Bangladesh Army (Jolshiri Abashon Project-02) |
| 6 |
Sand filling at Project-2 of Jolshiri Abashon as per Location Map as attached annexure A. Ref: 3917/62/JS/ Dev/Sand Filling/Project-2, Date: 06/10/2025 |
71,40,00,000.00 |
06-10-2025 |
Bangladesh Army (Jolshiri Abashon Project-02) |